Role: Preloader
Shifts Available:
- 1st Shift: 5:00 AM – 3:00 PM CST (Mon – Thu)
- 2nd Shift: 3:00 PM – 1:00 AM CST (Mon – Thu)
Key Responsibilities: Efficiently pre-sort, load, and organize items to ensure smooth operational flow and timely dispatch.
Physical Requirements: Continuous physical activity, including frequent lifting, carrying, and handling of packages weighing 10–25 lbs throughout